Crane · 2026
IWA Crane
Mesa, AZ · near Mesa Gateway (1.2 mi)
What this outcome means
The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.
The proposal, in the filer's words
"Crane operation for removal of swamp coolers on existing building. Point for the proposed crane location is provided."
Filing details
- Case number (ASN)
- 2026-AWP-1368-NRA
- Structure
- IWA Crane
- Type
- Crane / fixed
- Category
- Crane
- Height above ground
- 100 ft
- Height above sea level
- 1,443 ft
- Site elevation
- 1,343 ft
- Notice of
- New Construction
- Duration
- Temporary
- Marking & lighting
- —
Timeline
- Filed
- May 13, 2026
- Determined
- June 24, 2026
- Determination expires
- December 24, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- Mesa Gateway Airport Authority
- Representative
- Mesa Gateway Airport Authority
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 33.299686, -111.673700
- Degrees / minutes / seconds
- 33°17'58.9"N 111°40'25.3"W
- County
- Maricopa
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Mesa Gateway →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.