Rig · 2026
Drill Rig 32
Mesa, AZ · near Mesa Gateway (1.1 mi)
What this outcome means
The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.
The proposal, in the filer's words
"The scope of work includes investigating soil and groundwater to verify the presence of Perfluorinated Compounds (PFCs). This effort represents the second round of sampling following a previous study completed in 2018 and is being completed by the Air Force. A total of 35 monitoring wells and soil borings will be installed using a drill rig with a height of 40 feet. The proposed sampling is part of an ongoing PFC release site investigation at multiple BRAC installations."
Filing details
- Case number (ASN)
- 2026-AWP-86-NRA
- Structure
- Drill Rig 32
- Type
- Rig / drilling
- Category
- Rig
- Height above ground
- 40 ft
- Height above sea level
- 1,383 ft
- Site elevation
- 1,343 ft
- Notice of
- New Construction
- Duration
- Temporary
- Marking & lighting
- —
Timeline
- Filed
- January 13, 2026
- Determined
- March 10, 2026
- Determination expires
- September 10, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- Mesa Gateway Airport Authority
- Representative
- Mesa Gateway Airport Authority
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 33.303208, -111.673161
- Degrees / minutes / seconds
- 33°18'11.5"N 111°40'23.4"W
- County
- Maricopa
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Mesa Gateway →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.