Rig · 2026
Elverta Site Drill Rig-Revised Location
Sacramento, CA · near Sacramento Intl (1.5 mi)
What this outcome means
The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.
The proposal, in the filer's words
"A water supply well will be drilled constructed developed and tested as part of a multiple well construction project for the Natomas Mutual Water Company. Stonehouse Drilling and Construction LLC has a drill rig that will perform the work with a mast and draw works having a maximum stick-up height of 70 feet above ground surface. The completed permanent well structure will have a stick-up height of approximately 9 feet. The length of time to complete the work at the Elverta Site will take 3 to 4 weeks.This is a new submission with the corrected location. Professional F1 survey is included."
Filing details
- Case number (ASN)
- 2026-AWP-14829-OE
- Structure
- Elverta Site Drill Rig-Revised Location
- Type
- Rig / drilling
- Category
- Rig
- Height above ground
- 70 ft
- Height above sea level
- 95 ft
- Site elevation
- 25 ft
- Notice of
- New Construction
- Duration
- Temporary
- Marking & lighting
- —
Timeline
- Filed
- August 11, 2026
- Determined
- September 8, 2026
- Determination expires
- March 8, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- Natomas Mutual Water Company
- Representative
- Stonehouse Drilling & Construction
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 38.713811, -121.605406
- Degrees / minutes / seconds
- 38°42'49.7"N 121°36'19.5"W
- County
- Sacramento
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Sacramento Intl →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.