Building · 2026
P-1157 Guam High School Temp Facilities
Tamuning, GU · near Guam Intl (3.7 mi)
What this outcome means
The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.
The proposal, in the filer's words
"The DoDEA P1157 Guam High School Temporary Facilities project includes new construction of one (1) single story pre-engineered metal building totaling approximately 18 500 square feet site work and incidental related work. The new facility will include general purpose classrooms and a small PE wing. The new classroom building will be located near the classroom wing of the existing school. This temporary facility will increase the capacity of Guam High School by 250 students and designed to a minimum life span of 10 years."
Filing details
- Case number (ASN)
- 2026-AWP-15213-OE
- Structure
- P-1157 Guam High School Temp Facilities
- Type
- Building
- Category
- Building
- Height above ground
- 24 ft
- Height above sea level
- 198 ft
- Site elevation
- 174 ft
- Notice of
- New Construction
- Duration
- Permanent
- Marking & lighting
- —
Timeline
- Filed
- August 15, 2026
- Determined
- August 27, 2026
- Determination expires
- February 27, 2028
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- Chugach Consolidated Solutions, LLC
- Representative
- Joemani Bambilla
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 13.474725, 144.743093
- Degrees / minutes / seconds
- 13°28'29.0"N 144°44'35.1"E
- County
- Guam
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.