Returned to proponentDetermined - No Hazard15 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"• Base Bid\no Aircraft Access Gate 2 – Replacement of one (1) 50-foot gate panel with salvaged 50-foot gate panel from Gate 3 two (2) gate operator replacements and surface accessible flexible conduit replacements.\no Aircraft Access Gate 3 – Replacement of one (1) 50-foot gate panel with salvaged 50-foot gate panel from Gate 2.\no Aircraft Access Gate 5 – Replacement of one (1) 50-foot gate panel and one (1) 65-foot gate panel with new panels installation of gate track supports two (2) gate operator replacements and surface accessible flexible conduit replacements.\no Aircraft Access Gate 6 – Two (2) gate operator replacements and surface accessible flexible conduit replacements.\n• Add Alternate 1\no Aircraft Access Gate 1 – Two (2) gate operator replacements and surface accessible flexible conduit replacements.\no Aircraft Access Gate 3 – Two (2) gate operator replacements and surface accessible flexible conduit replacements.\no Aircraft Access Gate 4 – Two (2) gate operator replacements and surface accessible flexible conduit replacements.\n• Add Alternate 2\no Airport Drive Gate (Northbound) – One (1) gate operator replacement and surface-accessible flexible conduit replacements.\no Airport Drive Gate (Southbound) – One (1) gate operator replacement and surface-accessible flexible conduit replacements.\no Kilo Apron Gate – One (1) gate operator replacement and surface accessible flexible conduit replacements"

Filing details

Case number (ASN)
2026-AWP-306-NRA
Structure
Aircraft and Vehicle Gates
Type
Construction / vehicle
Category
Construction equipment
Height above ground
15 ft
Height above sea level
1,512 ft
Site elevation
1,497 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
February 4, 2026
Determined
May 6, 2026
Determination expires
November 6, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Scottsdale Airport
Representative
MEAD AND HUNT, INC.

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
33.620372, -111.911833
Degrees / minutes / seconds
33°37'13.3"N 111°54'42.6"W
County
Maricopa

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Scottsdale →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.