Skip to content
LOS Analyzer

Power line · 2026

35586174-MONTE RIO-FULTON-010/005

Forestville, CA · near Charles M Schulz/Sonoma County (7.7 mi)

Marking and lightingFinal53 ft AGL

What this outcome means

The outcome turns on marking and lighting conditions — typically obstruction lighting or paint required as a condition of the determination.

The proposal, in the filer's words

"Marking/Lighting change. Request to omit marking/lighting requirements. Due to structure being in the canyon. PGE is requesting to look at these support pictures to better show the terrain the structure is located in."

Filing details

Case number (ASN)
2026-AWP-3924-OE
Structure
35586174-MONTE RIO-FULTON-010/005
Type
Pole / utility
Category
Power line
Height above ground
53 ft
Height above sea level
433 ft
Site elevation
380 ft
Notice of
Existing
Duration
Permanent
Marking & lighting
—

Timeline

Filed
March 3, 2026
Determined
April 13, 2026
Determination expires
—

Who filed it

Sponsor
PG&E
Representative
EKN Engineering

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by PG&E →

Location

Coordinates
38.485831, -122.951114
Degrees / minutes / seconds
38°29'09.0"N 122°57'04.0"W
County
Sonoma

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.