Skip to content
LOS Analyzer

Crane · 2026

8-Unit Nested T-Hangar Building

Bullhead City, AZ · near Laughlin/Bullhead Intl (0.2 mi)

Returned to proponentDetermined - No Hazard100 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"Construction of an 8-Unit Nested T-Hangar Building with a Pre-Engineered Steel Frame enclosed with a Metal Panel Wall and Insulated Roof System eight Electric Bi-fold Doors two Overhead Doors and a Concrete Slab Floor. Structural engineering design of the foundation and building are deferred submittals provided by the Contractor’s structural engineer and building manufacturer."

Filing details

Case number (ASN)
2026-AWP-49-NRA
Structure
8-Unit Nested T-Hangar Building
Type
Crane
Category
Crane
Height above ground
100 ft
Height above sea level
751 ft
Site elevation
651 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
January 12, 2026
Determined
July 17, 2026
Determination expires
January 17, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Laughlin/Bullhead International Airport
Representative
Mead and Hunt

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
35.156714, -114.556300
Degrees / minutes / seconds
35°09'24.2"N 114°33'22.7"W
County
Mohave

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Laughlin/Bullhead Intl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.