Power line · 2026
X28761-X28762
Indian Springs, NV · near Creech Afb (7.8 mi)
What this outcome means
The outcome turns on marking and lighting conditions — typically obstruction lighting or paint required as a condition of the determination.
The proposal, in the filer's words
"This is a request for omission of marking and lighting. Please see the attached document for additional information."
Filing details
- Case number (ASN)
- 2026-AWP-5120-OE
- Structure
- X28761-X28762
- Type
- Catenary
- Category
- Power line
- Height above ground
- 136 ft
- Height above sea level
- 3,353 ft
- Site elevation
- 3,217 ft
- Notice of
- New Construction
- Duration
- Permanent
- Marking & lighting
- —
Timeline
- Filed
- March 20, 2026
- Determined
- March 24, 2026
- Determination expires
- —
Who filed it
- Sponsor
- NV Energy (AG)
- Representative
- Federal Airways & Airspace (TW)
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 36.526094, -115.558000
- Degrees / minutes / seconds
- 36°31'33.9"N 115°33'28.8"W
- County
- Clark
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Creech Afb →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.