Skip to content
LOS Analyzer

Wind turbine · 2026

17

Ringsted, IA · near Peltz Fld (7.5 mi)

Preliminary findingsReevaluating699 ft AGL

What this outcome means

An interim result issued while the aeronautical study continues. It is not the final determination.

The proposal, in the filer's words

"Filing for proposed wind project array located near Ringsted IA in Emmet County IA Site map uploaded to filing"

Filing details

Case number (ASN)
2026-WTE-2689-OE
Structure
17
Type
Windmill
Category
Wind turbine
Height above ground
699 ft
Height above sea level
1,939 ft
Site elevation
1,240 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
June 12, 2026
Determined
—
Determination expires
—

Who filed it

Sponsor
Green SUN WIND
Representative
Capitol Airspace Group

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Green SUN WIND →

Location

Coordinates
43.335103, -94.448961
Degrees / minutes / seconds
43°20'06.4"N 94°26'56.3"W
County
Emmet

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Peltz Fld →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.