Airport · 2026 filings
FAA obstruction filings near Washington Exec/Stafford Rgnl
68 structures were filed with the FAA in 2026 naming Washington Exec/Stafford Rgnl as the nearest airport. This is what people are proposing to build in its airspace, drawn from the FAA's public record.
Filings in 2026
68
Tallest proposed
240 ft
above ground level
Most recent filing
August 14, 2026
What is being filed
- Crane64
- Building1
- Tank stack1
- Solar1
- Antenna tower1
Where
- VA68
Most recent 50 filings
Newest first, of 68 total.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Planning something here?
Screen it against Part 77 before you file
LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.