Skip to content
LOS Analyzer

Organisation · 2026 filings

CenterPoint Energy Houston Electric, LLC — FAA obstruction filings

CenterPoint Energy Houston Electric, LLC filed 19 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

19

Tallest proposed

98 ft

above ground level

Most recent filing

May 5, 2026

What is being filed

  • Power line19

Where

  • TX19

Filings

STR Number 387602026-ASW-6650-OE · Power line · 98 ft AGL · Deer Park, TXMay 5, 2026Pole 82026-ASW-1660-OE · Power line · 48 ft AGL · Rosenberg, TXJanuary 26, 2026Pole 72026-ASW-1661-OE · Power line · 48 ft AGL · Rosenberg, TXJanuary 26, 2026Pole 62026-ASW-1662-OE · Power line · 48 ft AGL · Rosenberg, TXJanuary 26, 2026Pole 52026-ASW-1663-OE · Power line · 48 ft AGL · Rosenberg, TXJanuary 26, 2026Pole 42026-ASW-1664-OE · Power line · 48 ft AGL · Rosenberg, TXJanuary 26, 2026Pole 32026-ASW-1665-OE · Power line · 48 ft AGL · Rosenberg, TXJanuary 26, 2026Pole 22026-ASW-1666-OE · Power line · 48 ft AGL · Rosenberg, TXJanuary 26, 2026Pole 12026-ASW-1667-OE · Power line · 48 ft AGL · Rosenberg, TXJanuary 26, 2026Pole 22026-ASW-322-NRA · Power line · 39 ft AGL · Houston, TXJanuary 15, 2026Pole 112026-ASW-325-NRA · Power line · 39 ft AGL · La porte, TXJanuary 15, 2026Pole 102026-ASW-326-NRA · Power line · 39 ft AGL · La porte, TXJanuary 15, 2026Pole 92026-ASW-327-NRA · Power line · 39 ft AGL · La porte, TXJanuary 15, 2026Pole 82026-ASW-328-NRA · Power line · 39 ft AGL · La porte, TXJanuary 15, 2026Pole 72026-ASW-329-NRA · Power line · 39 ft AGL · La porte, TXJanuary 15, 2026Pole 62026-ASW-330-NRA · Power line · 39 ft AGL · La porte, TXJanuary 15, 2026Pole 52026-ASW-331-NRA · Power line · 39 ft AGL · La porte, TXJanuary 15, 2026Pole 22026-ASW-332-NRA · Power line · 39 ft AGL · La porte, TXJanuary 15, 2026Pole 12026-ASW-333-NRA · Power line · 38 ft AGL · La porte, TXJanuary 15, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch CenterPoint Energy Houston Electric, LLC

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.