City of Flandreau — FAA obstruction filings

City of Flandreau filed 27 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

27

Tallest proposed

15 ft

above ground level

Most recent filing

May 18, 2026

What is being filed

  • Construction equipment27

Where

  • SD27

Filings

4P3 RW - Phase 2 Work Area - Point 272026-AGL-8901-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW - Phase 2 Work Area - Point 262026-AGL-8902-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW - Phase 2 Work Area - Point 252026-AGL-8903-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW - Phase 2 Work Area - Point 242026-AGL-8904-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW - Phase 2 Work Area - Point 232026-AGL-8905-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW - Phase 2 Work Area - Point 222026-AGL-8906-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW - Phase 1 Work Area - Point 212026-AGL-8907-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW - Phase 1 Work Area - Point 202026-AGL-8908-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW - Phase 1/2 Work Area - Point 192026-AGL-8909-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW - Phase 1/2 Work Area - Point 182026-AGL-8910-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW - Phase 1/2 Work Area - Point 172026-AGL-8911-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW - Phase 1/2 Work Area - Point 162026-AGL-8912-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW - Phase 1/2 Work Area - Point 152026-AGL-8913-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW - Phase 1/2 Work Area - Point 142026-AGL-8914-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW - Phase 1/2 Work Area - Point 132026-AGL-8915-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW - Phase 1/2 Work Area - Point 122026-AGL-8916-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW - Phase 1/2 Work Area - Point 112026-AGL-8917-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW - Phase 1/2 Haul Route - Point 102026-AGL-8918-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW - Phase 1/2 Haul Route - Point 92026-AGL-8919-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW - Phase 1/2 Haul Route - Point 82026-AGL-8920-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW - Phase 1/2 Haul Route - Point 72026-AGL-8921-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW - Phase 1/2 Haul Route - Point 62026-AGL-8922-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW-Phase 1/2 Staging Area - Point 52026-AGL-8923-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW-Phase 1/2 Staging Area - Point 42026-AGL-8924-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW-Phase 1/2 Staging Area - Point 32026-AGL-8925-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 20264P3 RW-Phase 1/2 Staging Area - Point 22026-AGL-8926-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 2026493 RW- Phase 1/2 Staging Area - Point 12026-AGL-8927-NRA · Construction equipment · 15 ft AGL · Flandreau, SDMay 18, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch City of Flandreau

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.