Skip to content
LOS Analyzer

Organisation · 2026 filings

City of Galveston, Texas — FAA obstruction filings

City of Galveston, Texas filed 19 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

19

Tallest proposed

25 ft

above ground level

Most recent filing

June 9, 2026

What is being filed

  • Construction equipment18
  • Other1

Where

  • TX19

Filings

Supplemental Windcone2026-ASW-2629-NRA · Other · 20 ft AGL · Galveston, TXJune 9, 2026Temporary Construction Limit2026-ASW-1687-NRA · Construction equipment · 25 ft AGL · Galveston, TXApril 10, 2026Temporary Construction Limit2026-ASW-1688-NRA · Construction equipment · 20 ft AGL · Galveston, TXApril 10, 2026Temporary Construction Limit2026-ASW-1689-NRA · Construction equipment · 20 ft AGL · Galveston, TXApril 10, 2026Contractor Staging Area2026-ASW-1690-NRA · Construction equipment · 20 ft AGL · Galveston, TXApril 10, 2026Temporary Construction Limit2026-ASW-1691-NRA · Construction equipment · 20 ft AGL · Galveston, TXApril 10, 2026Contractor Staging Area2026-ASW-1692-NRA · Construction equipment · 20 ft AGL · Galveston, TXApril 10, 2026Temporary Construction Limit2026-ASW-1693-NRA · Construction equipment · 20 ft AGL · Galveston, TXApril 10, 2026Temporary Construction Limit2026-ASW-1694-NRA · Construction equipment · 20 ft AGL · Galveston, TXApril 10, 2026Temporary Construction Limit2026-ASW-1695-NRA · Construction equipment · 20 ft AGL · Galveston, TXApril 10, 2026Temporary Construction Limit2026-ASW-1697-NRA · Construction equipment · 20 ft AGL · Galveston, TXApril 10, 2026Temporary Construction Limit2026-ASW-1698-NRA · Construction equipment · 20 ft AGL · Galveston, TXApril 10, 2026Temporary Construction Limit2026-ASW-1699-NRA · Construction equipment · 20 ft AGL · Galveston, TXApril 10, 2026Temporary Construction Limit2026-ASW-1700-NRA · Construction equipment · 20 ft AGL · Galveston, TXApril 10, 2026Temporary Construction Limits2026-ASW-1702-NRA · Construction equipment · 25 ft AGL · Galveston, TXApril 10, 2026Temporary Construction Limits2026-ASW-1703-NRA · Construction equipment · 24 ft AGL · Galveston, TXApril 10, 2026Temporary Construction Limits2026-ASW-1704-NRA · Construction equipment · 24 ft AGL · Galveston, TXApril 10, 2026Temporary Construction Limits2026-ASW-1705-NRA · Construction equipment · 24 ft AGL · Galveston, TXApril 10, 2026Temporary Construction Limits2026-ASW-1706-NRA · Construction equipment · 24 ft AGL · Galveston, TXApril 10, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch City of Galveston, Texas

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.