Skip to content
LOS Analyzer

Organisation · 2026 filings

City of Le Sueur — FAA obstruction filings

City of Le Sueur filed 27 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

27

Tallest proposed

20 ft

above ground level

Most recent filing

March 20, 2026

What is being filed

  • Construction equipment27

Where

  • MN27

Filings

30 Phase 22026-AGL-4656-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 202629 Phase 22026-AGL-4657-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 202628 Phase 1 & 22026-AGL-4658-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 202627 Phase 1 & 22026-AGL-4659-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 202626 Phase 12026-AGL-4660-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 202625 Phase 12026-AGL-4661-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 202624 Phase 12026-AGL-4662-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 202623 Phase 12026-AGL-4663-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 202622 Phase 12026-AGL-4664-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 202621 Phase 12026-AGL-4665-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 202620 Phase 12026-AGL-4666-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 202619 Phase 12026-AGL-4667-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 202617 Phase 12026-AGL-4669-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 202616 Phase 12026-AGL-4670-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 202615 Phase 12026-AGL-4671-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 202614 Phase 12026-AGL-4672-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 202613 Phase 12026-AGL-4673-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 202612 Phase 12026-AGL-4674-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 202611 Phase 12026-AGL-4675-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 202610 Phase 12026-AGL-4676-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 20269 Phase 12026-AGL-4677-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 20268 Haul Route2026-AGL-4678-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 20267 Haul Route2026-AGL-4679-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 20264 Contractor Storage Area2026-AGL-4682-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 20263 Contractor Storage Area2026-AGL-4683-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 20262 Contractor Storage Area2026-AGL-4684-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 20261 Contractor Storage Area2026-AGL-4685-NRA · Construction equipment · 20 ft AGL · Le Sueur, MNMarch 20, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch City of Le Sueur

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.