Skip to content
LOS Analyzer

Organisation · 2026 filings

Dowagiac Municipal Airport — FAA obstruction filings

Dowagiac Municipal Airport filed 21 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

21

Tallest proposed

25 ft

above ground level

Most recent filing

August 4, 2026

What is being filed

  • Construction equipment21

Where

  • MI21

Filings

Staging Area Point 2082026-AGL-12619-NRA · Construction equipment · 25 ft AGL · Dowagiac, MIAugust 4, 2026Staging Area Point 2072026-AGL-12620-NRA · Construction equipment · 25 ft AGL · Dowagiac, MIAugust 4, 2026Staging Area Point 2062026-AGL-12621-NRA · Construction equipment · 25 ft AGL · Dowagiac, MIAugust 4, 2026Staging Area Point 2052026-AGL-12622-NRA · Construction equipment · 25 ft AGL · Dowagiac, MIAugust 4, 2026Staging Area Point 2042026-AGL-12623-NRA · Construction equipment · 25 ft AGL · Dowagiac, MIAugust 4, 2026Staging Area Point 2032026-AGL-12624-NRA · Construction equipment · 25 ft AGL · Dowagiac, MIAugust 4, 2026Staging Area Point 2022026-AGL-12625-NRA · Construction equipment · 25 ft AGL · Dowagiac, MIAugust 4, 2026Staging Area Point 2012026-AGL-12626-NRA · Construction equipment · 25 ft AGL · Dowagiac, MIAugust 4, 2026Work Area Point 1132026-AGL-12627-NRA · Construction equipment · 25 ft AGL · Dowagiac, MIAugust 4, 2026Work Area Point 1122026-AGL-12628-NRA · Construction equipment · 25 ft AGL · Dowagiac, MIAugust 4, 2026Work Area Point 1112026-AGL-12629-NRA · Construction equipment · 25 ft AGL · Dowagiac, MIAugust 4, 2026Work Area Point 1102026-AGL-12630-NRA · Construction equipment · 25 ft AGL · Dowagiac, MIAugust 4, 2026Work Area Point 1092026-AGL-12631-NRA · Construction equipment · 25 ft AGL · Dowagiac, MIAugust 4, 2026Work Area Point 1082026-AGL-12632-NRA · Construction equipment · 25 ft AGL · Dowagiac, MIAugust 4, 2026Work Area Point 1072026-AGL-12633-NRA · Construction equipment · 25 ft AGL · Dowagiac, MIAugust 4, 2026Work Area Point 1062026-AGL-12634-NRA · Construction equipment · 25 ft AGL · Dowagiac, MIAugust 4, 2026Work Area Point 1052026-AGL-12635-NRA · Construction equipment · 25 ft AGL · Dowagiac, MIAugust 4, 2026Work Area Point 1042026-AGL-12636-NRA · Construction equipment · 25 ft AGL · Dowagiac, MIAugust 4, 2026Work Area Point 1032026-AGL-12637-NRA · Construction equipment · 25 ft AGL · Dowagiac, MIAugust 4, 2026Work Area Point 1022026-AGL-12638-NRA · Construction equipment · 25 ft AGL · Dowagiac, MIAugust 4, 2026Work Area Point 1012026-AGL-12639-NRA · Construction equipment · 25 ft AGL · Dowagiac, MIAugust 4, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch Dowagiac Municipal Airport

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.