Skip to content
LOS Analyzer

Organisation · 2026 filings

Empty Sponsor — FAA obstruction filings

Empty Sponsor filed 26 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

26

Tallest proposed

100 ft

above ground level

Most recent filing

February 16, 2026

What is being filed

  • Power line26

Where

  • LA26

Filings

82 (P-R)2026-ASW-2833-OE · Power line · 80 ft AGL · Boyce, LAFebruary 16, 202681 (P-R)2026-ASW-2834-OE · Power line · 70 ft AGL · Boyce, LAFebruary 16, 202680 (P-R)2026-ASW-2835-OE · Power line · 70 ft AGL · Boyce, LAFebruary 16, 202679 (P-R)2026-ASW-2836-OE · Power line · 70 ft AGL · Boyce, LAFebruary 16, 202678 (P-R)2026-ASW-2837-OE · Power line · 65 ft AGL · Boyce, LAFebruary 16, 202677 (P-R)2026-ASW-2838-OE · Power line · 70 ft AGL · Boyce, LAFebruary 16, 202676 (P-R)2026-ASW-2839-OE · Power line · 75 ft AGL · Boyce, LAFebruary 16, 202675 (P-R)2026-ASW-2840-OE · Power line · 70 ft AGL · Boyce, LAFebruary 16, 202674 (P-R)2026-ASW-2841-OE · Power line · 75 ft AGL · Boyce, LAFebruary 16, 202673 (P-R)2026-ASW-2842-OE · Power line · 75 ft AGL · Boyce, LAFebruary 16, 202672 (P-R)2026-ASW-2843-OE · Power line · 70 ft AGL · Boyce, LAFebruary 16, 202671 (P-R)2026-ASW-2844-OE · Power line · 70 ft AGL · Boyce, LAFebruary 16, 202670 (P-R)2026-ASW-2845-OE · Power line · 70 ft AGL · Boyce, LAFebruary 16, 202669 (P-R)2026-ASW-2846-OE · Power line · 75 ft AGL · Boyce, LAFebruary 16, 202668 (P-R)2026-ASW-2847-OE · Power line · 80 ft AGL · Boyce, LAFebruary 16, 202667 (P-R)2026-ASW-2848-OE · Power line · 95 ft AGL · Boyce, LAFebruary 16, 202666 (P-R)2026-ASW-2849-OE · Power line · 75 ft AGL · Boyce, LAFebruary 16, 202665 (P-R)2026-ASW-2850-OE · Power line · 70 ft AGL · Boyce, LAFebruary 16, 202664 (P-R)2026-ASW-2851-OE · Power line · 70 ft AGL · Boyce, LAFebruary 16, 202663 (P-R)2026-ASW-2852-OE · Power line · 65 ft AGL · Boyce, LAFebruary 16, 202662 (P-R)2026-ASW-2853-OE · Power line · 70 ft AGL · Boyce, LAFebruary 16, 202661 (P-R)2026-ASW-2854-OE · Power line · 70 ft AGL · Boyce, LAFebruary 16, 202660 (P-R)2026-ASW-2855-OE · Power line · 75 ft AGL · Boyce, LAFebruary 16, 202659 (P-R)2026-ASW-2856-OE · Power line · 75 ft AGL · Boyce, LAFebruary 16, 2026Str. 582026-ASW-2857-OE · Power line · 80 ft AGL · Boyce, LAFebruary 16, 2026Str. 902026-ASW-2858-OE · Power line · 100 ft AGL · Boyce, LAFebruary 16, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch Empty Sponsor

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.