Skip to content
LOS Analyzer

Organisation · 2026 filings

Glenwood Municipal Airport — FAA obstruction filings

Glenwood Municipal Airport filed 32 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

32

Tallest proposed

20 ft

above ground level

Most recent filing

March 17, 2026

What is being filed

  • Construction equipment32

Where

  • MN32

Filings

Construction Limits pt-262026-AGL-4512-NRA · Construction equipment · 20 ft AGL · Glencoe, MNMarch 17, 2026Construction Limits2026-AGL-4513-NRA · Construction equipment · 20 ft AGL · Glencoe, MNMarch 17, 2026Construction Limits pt-252026-AGL-4514-NRA · Construction equipment · 20 ft AGL · Glencoe, MNMarch 17, 2026Construction Limits pt-242026-AGL-4515-NRA · Construction equipment · 20 ft AGL · Glencoe, MNMarch 17, 2026Construction Limits pt-232026-AGL-4516-NRA · Construction equipment · 20 ft AGL · Glencoe, MNMarch 17, 2026Construction Limits pt-222026-AGL-4517-NRA · Construction equipment · 20 ft AGL · Glencoe, MNMarch 17, 2026Construction Limits pt-212026-AGL-4518-NRA · Construction equipment · 20 ft AGL · Glencoe, MNMarch 17, 2026Construction Limits pt-202026-AGL-4519-NRA · Construction equipment · 20 ft AGL · Glencoe, MNMarch 17, 2026Construction Limits pt-192026-AGL-4520-NRA · Construction equipment · 20 ft AGL · Glencoe, MNMarch 17, 2026Construction Limits pt-182026-AGL-4521-NRA · Construction equipment · 20 ft AGL · Glencoe, MNMarch 17, 202615 Construction Limits2026-AGL-1481-NRA · Construction equipment · 20 ft AGL · Glenwood, MNFebruary 4, 202614 Construction Limits2026-AGL-1482-NRA · Construction equipment · 20 ft AGL · Glenwood, MNFebruary 4, 202613 Construction Limits2026-AGL-1483-NRA · Construction equipment · 20 ft AGL · Glenwood, MNFebruary 4, 202612 Construction Limits2026-AGL-1484-NRA · Construction equipment · 20 ft AGL · Glenwood, MNFebruary 4, 202611 Construction Limits2026-AGL-1485-NRA · Construction equipment · 20 ft AGL · Glenwood, MNFebruary 4, 202610 Construction Limits2026-AGL-1486-NRA · Construction equipment · 20 ft AGL · Glenwood, MNFebruary 4, 20269 Construction Limits2026-AGL-1487-NRA · Construction equipment · 20 ft AGL · Glenwood, MNFebruary 4, 20268 Construction Limits2026-AGL-1488-NRA · Construction equipment · 20 ft AGL · Glenwood, MNFebruary 4, 20267 Construction Limits2026-AGL-1489-NRA · Construction equipment · 20 ft AGL · Glenwood, MNFebruary 4, 20266 Construction Limits2026-AGL-1490-NRA · Construction equipment · 20 ft AGL · Glenwood, MNFebruary 4, 20265 Construction Limits2026-AGL-1491-NRA · Construction equipment · 20 ft AGL · Glenwood, MNFebruary 4, 20264 Construction Limits2026-AGL-1492-NRA · Construction equipment · 20 ft AGL · Glenwood, MNFebruary 4, 20263 Construction Limits2026-AGL-1493-NRA · Construction equipment · 20 ft AGL · Glenwood, MNFebruary 4, 20262 Construction Limits2026-AGL-1494-NRA · Construction equipment · 20 ft AGL · Glenwood, MNFebruary 4, 20261 Construction Limits2026-AGL-1495-NRA · Construction equipment · 20 ft AGL · Glenwood, MNFebruary 4, 20263 Haul Route2026-AGL-1496-NRA · Construction equipment · 20 ft AGL · Glenwood, MNFebruary 4, 20262 Haul Route2026-AGL-1497-NRA · Construction equipment · 20 ft AGL · Glenwood, MNFebruary 4, 20261 Haul Route2026-AGL-1498-NRA · Construction equipment · 20 ft AGL · Glenwood, MNFebruary 4, 20264 Contractor Storage Area2026-AGL-1499-NRA · Construction equipment · 20 ft AGL · Glenwood, MNFebruary 4, 20263 Contractor Storage Area2026-AGL-1500-NRA · Construction equipment · 20 ft AGL · Glenwood, MNFebruary 4, 20262 Contractor Storage Area2026-AGL-1501-NRA · Construction equipment · 20 ft AGL · Glenwood, MNFebruary 4, 2026Contractor Storage Area 12026-AGL-1502-NRA · Construction equipment · 20 ft AGL · Glenwood, MNFebruary 4, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch Glenwood Municipal Airport

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.