Organisation · 2026 filings
Harmoni Towers Gateway, LLC-CHADR — FAA obstruction filings
Harmoni Towers Gateway, LLC-CHADR filed 20 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.
Filings in 2026
20
Tallest proposed
270 ft
above ground level
Most recent filing
July 29, 2026
What is being filed
- Antenna tower20
Where
- OR5
- CA4
- WA3
- ID2
- TX2
- MO1
Filings
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Planning something here?
Screen it against Part 77 before you file
LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.