Skip to content
LOS Analyzer

Organisation · 2026 filings

Massachusetts PORT Authority — FAA obstruction filings

Massachusetts PORT Authority filed 82 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

82

Tallest proposed

255 ft

above ground level

Most recent filing

May 27, 2026

What is being filed

  • Crane68
  • Building10
  • Fence2
  • Construction equipment2

Where

  • MA82

Most recent 50 filings

Newest first, of 82 total.

GBD/SB2 Construction Crane PT-A2026-ANE-875-NRA · Crane · 120 ft AGL · Boston, MAMay 27, 2026GBD/SB2 Construction Crane PT-B2026-ANE-876-NRA · Crane · 120 ft AGL · Boston, MAMay 27, 2026GBD/SB2 Construction Crane PT-C2026-ANE-877-NRA · Crane · 120 ft AGL · Boston, MAMay 27, 2026GBD/SB2 Construction Crane PT-D2026-ANE-878-NRA · Crane · 120 ft AGL · Boston, MAMay 27, 2026SCLD Construction Crane PT-A2026-ANE-879-NRA · Crane · 50 ft AGL · Boston, MAMay 27, 2026SCLD Construction Crane PT-B2026-ANE-880-NRA · Crane · 50 ft AGL · Boston, MAMay 27, 2026SCLD Construction Crane PT-C2026-ANE-881-NRA · Crane · 50 ft AGL · Boston, MAMay 27, 2026SCLD Construction Crane PT-D2026-ANE-882-NRA · Crane · 50 ft AGL · Boston, MAMay 27, 2026BOS Terminal C Improvements AHU23 Crane2026-ANE-798-NRA · Crane · 175 ft AGL · Boston, MAMay 18, 2026LVSMF RW 33L Visual Screen Fence2026-ANE-610-NRA · Fence · 15 ft AGL · Boston, MAApril 23, 2026Crane for Jet Blast Wall construction2026-ANE-605-NRA · Crane · 45 ft AGL · Bedford, MAApril 16, 2026Liberty Mutual Blast Attenuator2026-ANE-604-NRA · Fence · 22 ft AGL · Bedford, MAApril 14, 2026M1-1A / Runway 9-27 RSA Improvements2026-ANE-573-NRA · Crane · 170 ft AGL · East Boston, MAApril 8, 2026M1-6A / Runway 9-27 RSA Improvements2026-ANE-574-NRA · Crane · 170 ft AGL · East Boston, MAApril 8, 2026LVSMF Construction Crane PT-A2026-ANE-561-NRA · Crane · 150 ft AGL · Boston, MAApril 1, 2026LVSMF Construction Crane PT-B2026-ANE-562-NRA · Crane · 150 ft AGL · Boston, MAApril 1, 2026LVSMF Construction Crane PT-C2026-ANE-563-NRA · Crane · 150 ft AGL · Boston, MAApril 1, 2026LVSMF Construction Crane PT-D2026-ANE-564-NRA · Crane · 150 ft AGL · Boston, MAApril 1, 2026Crane on Barge - Berths 1 & 22026-ANE-868-OE · Crane · 105 ft AGL · Boston, MAMarch 27, 2026TW Rehab Temporary Construction Equipment2026-ANE-319-NRA · Construction equipment · 25 ft AGL · Boston, MAFebruary 27, 2026Terminal C2026-ANE-159-NRA · Construction equipment · 255 ft AGL · Boston, MAFebruary 12, 2026GBD/SB2 Construction Crane PT-A2026-ANE-102-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026GBD/SB2 Construction Crane PT-B2026-ANE-103-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026GBD/SB2 Construction Crane PT-C2026-ANE-104-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026GBD/SB2 Construction Crane PT-D2026-ANE-105-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026SCLD Construction Crane PT-A2026-ANE-106-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026SCLD Construction Crane PT-B2026-ANE-107-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026SCLD Construction Crane PT-C2026-ANE-108-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026SCLD Construction Crane PT-D2026-ANE-109-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026Wildlife Construction Crane PT-A2026-ANE-110-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026Wildlife Construction Crane PT-B2026-ANE-111-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026Wildlife Construction Crane PT-C2026-ANE-112-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026Wildlife Construction Crane PT-D2026-ANE-113-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026Sand Shed Construction Crane PT-A2026-ANE-114-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026Sand Shed Construction Crane PT-B2026-ANE-115-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026Sand Shed Construction Crane PT-C2026-ANE-116-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026Sand Shed Construction Crane PT-D2026-ANE-117-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026Fuel Station Construction Crane PT-A2026-ANE-118-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026Fuel Station Construction Crane PT-B2026-ANE-119-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026Fuel Station Construction Crane PT-C2026-ANE-120-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026Fuel Station Construction Crane PT-D2026-ANE-121-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026FAA Building Construction Crane PT-A2026-ANE-122-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026FAA Building Construction Crane PT-B2026-ANE-123-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026FAA Building Construction Crane PT-C2026-ANE-124-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026FAA Building Construction Crane PT-D2026-ANE-125-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026Switch Station Construction Crane PT-A2026-ANE-130-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026Switch Station Construction Crane PT-B2026-ANE-131-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026Switch Station Construction Crane PT-C2026-ANE-132-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026Switch Station Construction Crane PT-D2026-ANE-133-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026Transfer Station Construction Crane PT-A2026-ANE-134-NRA · Crane · 150 ft AGL · Boston, MAFebruary 5, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch Massachusetts PORT Authority

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.