Skip to content
LOS Analyzer

Organisation · 2026 filings

Massachusetts PORT Authority (massport) - BOS — FAA obstruction filings

Massachusetts PORT Authority (massport) - BOS filed 22 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

22

Tallest proposed

25 ft

above ground level

Most recent filing

May 19, 2026

What is being filed

  • Construction equipment22

Where

  • MA22

Filings

Terminal C/E Alleyway Point 12026-ANE-829-NRA · Construction equipment · 25 ft AGL · Boston, MAMay 19, 2026Terminal C/E Alleyway Point 22026-ANE-830-NRA · Construction equipment · 25 ft AGL · Boston, MAMay 19, 2026Terminal C/E Alleyway Point 32026-ANE-831-NRA · Construction equipment · 25 ft AGL · Boston, MAMay 19, 2026Terminal C/E Alleyway Point 42026-ANE-832-NRA · Construction equipment · 25 ft AGL · Boston, MAMay 19, 2026Terminal C Alleyway Point 12026-ANE-833-NRA · Construction equipment · 25 ft AGL · Boston, MAMay 19, 2026Terminal C Alleyway Point 22026-ANE-834-NRA · Construction equipment · 25 ft AGL · Boston, MAMay 19, 2026Terminal C Alleyway Point 32026-ANE-835-NRA · Construction equipment · 25 ft AGL · Boston, MAMay 19, 2026Terminal C Alleyway Point 42026-ANE-836-NRA · Construction equipment · 25 ft AGL · Boston, MAMay 19, 2026Terminal C Alleyway Point 52026-ANE-837-NRA · Construction equipment · 25 ft AGL · Boston, MAMay 19, 2026Terminal B/C Alleyway Point 12026-ANE-838-NRA · Construction equipment · 25 ft AGL · Boston, MAMay 19, 2026Terminal B/C Alleyway Point 22026-ANE-839-NRA · Construction equipment · 25 ft AGL · Boston, MAMay 19, 2026Terminal B/C Alleyway Point 32026-ANE-840-NRA · Construction equipment · 25 ft AGL · Boston, MAMay 19, 2026Terminal B/C Alleyway Point 42026-ANE-841-NRA · Construction equipment · 25 ft AGL · Boston, MAMay 19, 2026BOS Alleyways Haul Route - North Gate2026-ANE-843-NRA · Construction equipment · 25 ft AGL · Boston, MAMay 19, 2026BOS Alleyways Haul Route - North Gate pt22026-ANE-844-NRA · Construction equipment · 25 ft AGL · Boston, MAMay 19, 2026BOS Alleyways Haul Route - North Gate pt32026-ANE-845-NRA · Construction equipment · 25 ft AGL · Boston, MAMay 19, 2026BOS Alleyways Haul Route - North Gate pt.42026-ANE-846-NRA · Construction equipment · 25 ft AGL · Boston, MAMay 19, 2026BOS Alleyways Haul Route - North Gate pt52026-ANE-847-NRA · Construction equipment · 25 ft AGL · Boston, MAMay 19, 2026BOS Alleyways Haul Route - South Gate pt12026-ANE-848-NRA · Construction equipment · 25 ft AGL · Boston, MAMay 19, 2026BOS Alleyways Haul Route - South Gate pt.22026-ANE-849-NRA · Construction equipment · 25 ft AGL · Boston, MAMay 19, 2026BOS Alleyways Haul Route - South Gate pt32026-ANE-850-NRA · Construction equipment · 25 ft AGL · Boston, MAMay 19, 2026BOS Alleyways Haul Route - South Gate pt42026-ANE-851-NRA · Construction equipment · 25 ft AGL · Boston, MAMay 19, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch Massachusetts PORT Authority (massport) - BOS

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.