Skip to content
LOS Analyzer

Organisation · 2026 filings

McDonald's USA LLC — FAA obstruction filings

McDonald's USA LLC filed 22 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

22

Tallest proposed

60 ft

above ground level

Most recent filing

August 20, 2026

What is being filed

  • Terrain vegetation7
  • Pole lighting7
  • Sign3
  • Tank stack2
  • Crane1
  • Building1

Where

  • MI22

Filings

Parking Lot Lighting Alteration / Marking2026-AGL-13467-OE · Tank stack · 10 ft AGL · Sault Ste. Marie, MIAugust 20, 2026Crane - McDonald's 2850 I75 Business Spur2026-AGL-11047-OE · Crane · 57 ft AGL · Sault Ste. Marie, MIJuly 6, 2026Honey Locust2026-AGL-11015-OE · Terrain vegetation · 60 ft AGL · Sault Ste. Marie, MIJuly 2, 2026Scots Pine2026-AGL-11020-OE · Terrain vegetation · 50 ft AGL · Sault Ste. Marie, MIJuly 2, 2026Honey Locust2026-AGL-11022-OE · Terrain vegetation · 60 ft AGL · Sault Ste. Marie, MIJuly 2, 2026White Spruce2026-AGL-11023-OE · Terrain vegetation · 60 ft AGL · Sault Ste. Marie, MIJuly 2, 2026McDonald's 2850 I75 Business Spur Sign2026-AGL-11027-OE · Sign · 35 ft AGL · Sault Ste. Marie, MIJuly 2, 2026McDonald's 2850 I75 Business Spur2026-AGL-10592-OE · Building · 21 ft AGL · Sault Ste. Marie, MIJune 30, 2026McDonald's 2850 I75 Business Spur2026-AGL-10635-OE · Pole lighting · 21 ft AGL · Sault Ste. Marie, MIJune 30, 2026McDonald's 2850 I75 Business Spur2026-AGL-10636-OE · Pole lighting · 21 ft AGL · Sault Ste. Marie, MIJune 30, 2026McDonald's 2850 I75 Business Spur2026-AGL-10637-OE · Pole lighting · 21 ft AGL · Sault Ste. Marie, MIJune 30, 2026McDonald's 2850 I75 Business Spur2026-AGL-10638-OE · Pole lighting · 21 ft AGL · Sault Ste. Marie, MIJune 30, 2026McDonald's 2850 I75 Business Spur2026-AGL-10641-OE · Pole lighting · 21 ft AGL · Sault Ste. Marie, MIJune 30, 2026Dumpster/Shed2026-AGL-10643-OE · Tank stack · 10 ft AGL · Sault Ste. Marie, MIJune 30, 2026McDonald's 2850 I75 Business Spur2026-AGL-10644-OE · Sign · 12 ft AGL · Sault Ste. Marie, MIJune 30, 20267' Sign West of Building2026-AGL-10645-OE · Sign · 7 ft AGL · Sault Ste. Marie, MIJune 30, 2026Honey Locust2026-AGL-10658-OE · Terrain vegetation · 60 ft AGL · Sault Ste. Marie, MIJune 30, 2026Scots Pine2026-AGL-10659-OE · Terrain vegetation · 50 ft AGL · Sault Ste. Marie, MIJune 30, 2026Scots Pine2026-AGL-10662-OE · Terrain vegetation · 50 ft AGL · Sault Ste. Marie, MIJune 30, 2026Telehandler2026-AGL-10566-OE · Construction equipment · 55 ft AGL · Sault Ste. Marie, MIJune 29, 2026McDonald's 2850 I75 Business Spur2026-AGL-10576-OE · Pole lighting · 21 ft AGL · Sault Ste. Marie, MIJune 29, 2026McDonald's 2850 I75 Business Spur2026-AGL-9081-OE · Pole lighting · 21 ft AGL · Sault Ste. Marie, MIJune 11, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch McDonald's USA LLC

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.