Skip to content
LOS Analyzer

Organisation · 2026 filings

Millinocket Municipal Airport — FAA obstruction filings

Millinocket Municipal Airport filed 27 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

27

Tallest proposed

25 ft

above ground level

Most recent filing

May 5, 2026

What is being filed

  • Construction equipment27

Where

  • ME27

Filings

This point is for the CSPP2026-ANE-747-NRA · Construction equipment · 1 ft AGL · Millinocket, MEMay 5, 2026Pt 25 Material Stockpile Area2026-ANE-718-NRA · Construction equipment · 25 ft AGL · Millinocket, MEMay 1, 2026Pt 24 Material Stockpile Area2026-ANE-719-NRA · Construction equipment · 25 ft AGL · Millinocket, MEMay 1, 2026Pt 23 RW 11 Blast Pad2026-ANE-720-NRA · Construction equipment · 20 ft AGL · Millinocket, MEMay 1, 2026Pt 22 RW 11 Blast Pad2026-ANE-721-NRA · Construction equipment · 20 ft AGL · Millinocket, MEMay 1, 2026Pt 21 Contractor Staging Area2026-ANE-722-NRA · Construction equipment · 20 ft AGL · Millinocket, MEMay 1, 2026Pt 20 Contractor Staging Area2026-ANE-723-NRA · Construction equipment · 20 ft AGL · Millinocket, MEMay 1, 2026Pt 19 RW 16 Pave2026-ANE-724-NRA · Construction equipment · 20 ft AGL · Millinocket, MEMay 1, 2026Pt 18 Prop TW A2026-ANE-725-NRA · Construction equipment · 20 ft AGL · Millinocket, MEMay 1, 2026Pt 17 Prop TW A2026-ANE-726-NRA · Construction equipment · 20 ft AGL · Millinocket, MEMay 1, 2026Pt 16 Prop TW A2026-ANE-727-NRA · Construction equipment · 20 ft AGL · Millinocket, MEMay 1, 2026Pt 15 RW 34 3 Numeral2026-ANE-728-NRA · Construction equipment · 20 ft AGL · Millinocket, MEMay 1, 2026Pt 14 RW 34 4 Numeral2026-ANE-729-NRA · Construction equipment · 20 ft AGL · Millinocket, MEMay 1, 2026Pt 13 RW 16-34 Center2026-ANE-730-NRA · Construction equipment · 20 ft AGL · Millinocket, MEMay 1, 2026Pt 12 RW 16 Pave2026-ANE-731-NRA · Construction equipment · 20 ft AGL · Millinocket, MEMay 1, 2026Pt 11 Wind Cone2026-ANE-732-NRA · Construction equipment · 12 ft AGL · Millinocket, MEMay 1, 2026Pt 10 RW 29 Loop Pave2026-ANE-733-NRA · Construction equipment · 20 ft AGL · Millinocket, MEMay 1, 2026Pt 9 RW 29 Pave2026-ANE-734-NRA · Construction equipment · 20 ft AGL · Millinocket, MEMay 1, 2026Pt 8 RW 29 Prop Pave2026-ANE-735-NRA · Construction equipment · 20 ft AGL · Millinocket, MEMay 1, 2026Pt 7 RW 29 Grading2026-ANE-736-NRA · Construction equipment · 20 ft AGL · Millinocket, MEMay 1, 2026Pt 6 RW 29 Grading2026-ANE-737-NRA · Construction equipment · 20 ft AGL · Millinocket, MEMay 1, 2026Pt 5 RW 29 Prop Pave2026-ANE-738-NRA · Construction equipment · 20 ft AGL · Millinocket, MEMay 1, 2026Pt 4 RW 29 Pave2026-ANE-739-NRA · Construction equipment · 20 ft AGL · Millinocket, MEMay 1, 2026Pt 3 RW 11-29 Center2026-ANE-740-NRA · Construction equipment · 20 ft AGL · Millinocket, MEMay 1, 2026Pt 2 RW 16 and RW 11 NE Quadrant2026-ANE-741-NRA · Construction equipment · 20 ft AGL · Millinocket, MEMay 1, 2026Pt 1 RW 16 Blast Pad2026-ANE-742-NRA · Construction equipment · 20 ft AGL · Millinocket, MEMay 1, 2026Temporary Use of Construction Equipment2026-ANE-743-NRA · Construction equipment · 20 ft AGL · Millinocket, MEMay 1, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch Millinocket Municipal Airport

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.