Skip to content
LOS Analyzer

Organisation · 2026 filings

National Grid - D.Ascioti — FAA obstruction filings

National Grid - D.Ascioti filed 19 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

19

Tallest proposed

66 ft

above ground level

Most recent filing

May 13, 2026

What is being filed

  • Power line19

Where

  • NY19

Filings

Structure 2862026-AEA-6282-OE · Power line · 39 ft AGL · Latham, NYMay 13, 2026Structure 242026-AEA-6283-OE · Power line · 59 ft AGL · Latham, NYMay 13, 2026Structure 6.52026-AEA-6284-OE · Power line · 48 ft AGL · Latham, NYMay 13, 2026Structure 62026-AEA-6285-OE · Power line · 48 ft AGL · Latham, NYMay 13, 2026Structure 5.52026-AEA-6286-OE · Power line · 54 ft AGL · Latham, NYMay 13, 2026Structure 52026-AEA-6287-OE · Power line · 66 ft AGL · Latham, NYMay 13, 2026Structure 42026-AEA-6288-OE · Power line · 66 ft AGL · Latham, NYMay 13, 2026Structure 32026-AEA-6289-OE · Power line · 61 ft AGL · Latham, NYMay 13, 2026Structure 22026-AEA-6290-OE · Power line · 61 ft AGL · Latham, NYMay 13, 2026Structure 1.52026-AEA-6291-OE · Power line · 57 ft AGL · Latham, NYMay 13, 2026Structure 12026-AEA-6292-OE · Power line · 48 ft AGL · Latham, NYMay 13, 2026Structure 413-12026-AEA-5582-OE · Power line · 41 ft AGL · Latham, NYApril 23, 2026Structure 25.52026-AEA-5583-OE · Power line · 44 ft AGL · Latham, NYApril 23, 2026Structure 26.52026-AEA-5584-OE · Power line · 44 ft AGL · Latham, NYApril 23, 2026Structure 272026-AEA-5585-OE · Power line · 57 ft AGL · Latham, NYApril 23, 2026Structure 44.52026-AEA-5586-OE · Power line · 34 ft AGL · Latham, NYApril 23, 2026Structure 45-S2026-AEA-5587-OE · Power line · 34 ft AGL · Latham, NYApril 23, 2026Structure 45.52026-AEA-5588-OE · Power line · 39 ft AGL · Latham, NYApril 23, 2026Structure 46.52026-AEA-5589-OE · Power line · 43 ft AGL · Latham, NYApril 23, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch National Grid - D.Ascioti

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.