Skip to content
LOS Analyzer

Organisation · 2026 filings

Oregon Department OF Aviation — FAA obstruction filings

Oregon Department OF Aviation filed 31 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

31

Tallest proposed

17 ft

above ground level

Most recent filing

May 12, 2026

What is being filed

  • Construction equipment30
  • Building1

Where

  • OR31

Filings

Condon Surface Seal2026-ANM-1464-NRA · Construction equipment · 12 ft AGL · Condon, ORMay 12, 2026Mulino Hangar and Waterline2026-ANM-1172-NRA · Construction equipment · 12 ft AGL · Mulino, Oregon, ORApril 20, 2026Mulino Hangar and Waterline2026-ANM-1173-NRA · Construction equipment · 12 ft AGL · Mulino, Oregon, ORApril 20, 2026Mulino Hangar and Waterline2026-ANM-1174-NRA · Construction equipment · 12 ft AGL · Mulino, ORApril 20, 2026Independence PAPI Replacement2026-ANM-1162-NRA · Construction equipment · 12 ft AGL · Independence, ORApril 17, 2026Independence PAPI Replacement2026-ANM-1163-NRA · Construction equipment · 12 ft AGL · Independence, ORApril 17, 2026Independence PAPI Replacement2026-ANM-1164-NRA · Construction equipment · 12 ft AGL · Independence, ORApril 17, 2026Independence PAPI Replacement2026-ANM-1165-NRA · Construction equipment · 12 ft AGL · Independence, ORApril 17, 2026Joseph AWOS Replacement2026-ANM-1167-NRA · Construction equipment · 12 ft AGL · Joseph, ORApril 17, 2026Joseph AWOS Replacement2026-ANM-1168-NRA · Construction equipment · 12 ft AGL · Joseph, ORApril 17, 2026Mulino Hangar2026-ANM-1142-NRA · Building · 17 ft AGL · Mulino, Oregon, ORApril 16, 2026Condon Surface Seal2026-ANM-1124-NRA · Construction equipment · 12 ft AGL · Condon, ORApril 14, 2026Mulino Surface Seal2026-ANM-1125-NRA · Construction equipment · 12 ft AGL · Mulino, Oregon, ORApril 14, 2026Chiloquin Surface Seal2026-ANM-1050-NRA · Construction equipment · 12 ft AGL · Chiloquin, ORApril 8, 2026Chiloquin Surface Seal2026-ANM-1051-NRA · Construction equipment · 12 ft AGL · Chiloquin, ORApril 8, 2026Chiloquin Surface Seal2026-ANM-1052-NRA · Construction equipment · 12 ft AGL · Chiloquin, ORApril 8, 2026Condon Surface Seal2026-ANM-1054-NRA · Construction equipment · 12 ft AGL · Condon, ORApril 8, 2026Condon Surface Seal2026-ANM-1055-NRA · Construction equipment · 12 ft AGL · Condon, ORApril 8, 2026Condon Surface Seal2026-ANM-1056-NRA · Construction equipment · 12 ft AGL · Condon, ORApril 8, 2026Joseph Surface Seal2026-ANM-1058-NRA · Construction equipment · 12 ft AGL · Joseph, ORApril 8, 2026Joseph Surface Seal2026-ANM-1059-NRA · Construction equipment · 12 ft AGL · Joseph, ORApril 8, 2026Joseph Surface Seal2026-ANM-1060-NRA · Construction equipment · 12 ft AGL · Joseph, ORApril 8, 2026Joseph Surface Seal2026-ANM-1061-NRA · Construction equipment · 12 ft AGL · Joseph, ORApril 8, 2026Lebanon Surface Seal2026-ANM-1063-NRA · Construction equipment · 12 ft AGL · Lebanon, ORApril 8, 2026Lebanon Surface Seal2026-ANM-1064-NRA · Construction equipment · 12 ft AGL · Lebanon, ORApril 8, 2026Lebanon Surface Seal2026-ANM-1065-NRA · Construction equipment · 12 ft AGL · Lebanon, ORApril 8, 2026Lebanon Surface Seal2026-ANM-1066-NRA · Construction equipment · 12 ft AGL · Lebanon, ORApril 8, 2026Mulino Surface Seal2026-ANM-1072-NRA · Construction equipment · 12 ft AGL · Mulino, Oregon, ORApril 8, 2026Mulino Surface Seal2026-ANM-1073-NRA · Construction equipment · 12 ft AGL · Mulino, Oregon, ORApril 8, 2026Mulino Surface Seal2026-ANM-1074-NRA · Construction equipment · 12 ft AGL · Mulino, Oregon, ORApril 8, 2026Mulino Surface Seal2026-ANM-1075-NRA · Construction equipment · 12 ft AGL · Mulino, Oregon, ORApril 8, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch Oregon Department OF Aviation

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.