Organisation · 2026 filings
PG&E S.Fassnacht — FAA obstruction filings
PG&E S.Fassnacht filed 389 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.
Filings in 2026
389
Tallest proposed
68 ft
above ground level
Most recent filing
May 14, 2026
What is being filed
- Power line389
Where
- CA389
Most recent 50 filings
Newest first, of 389 total.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Planning something here?
Screen it against Part 77 before you file
LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.