Skip to content
LOS Analyzer

Organisation · 2026 filings

Sun State Towers — FAA obstruction filings

Sun State Towers filed 43 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

43

Tallest proposed

219 ft

above ground level

Most recent filing

August 25, 2026

What is being filed

  • Antenna tower23
  • Crane20

Where

  • AZ30
  • NM9
  • NV4

Filings

AZ11-242 Thumper2026-AWP-15541-OE · Antenna tower · 145 ft AGL · Snowflake, AZAugust 25, 2026AZ11-242 Thumper2026-AWP-15543-OE · Crane · 155 ft AGL · Snowflake, AZAugust 25, 2026NM16-267 Hot Shot2026-ASW-11814-OE · Antenna tower · 195 ft AGL · Artesia, NMJuly 22, 2026NM16-267 Hot Shot2026-ASW-11815-OE · Crane · 215 ft AGL · Artesia, NMJuly 22, 2026NM15-208 Pearce2026-ASW-11568-OE · Antenna tower · 199 ft AGL · Tatum, NMJuly 17, 2026NM15-208 Pearce2026-ASW-11569-OE · Crane · 219 ft AGL · Tatum, NMJuly 17, 2026NV01-155 Fuzzy2026-AWP-13381-OE · Antenna tower · 88 ft AGL · Henderson, NVJuly 14, 2026NV01-155 Fuzzy2026-AWP-13383-OE · Crane · 108 ft AGL · Henderson, NVJuly 14, 2026AZ14-223 Noah2026-AWP-13164-OE · Antenna tower · 199 ft AGL · Salome, AZJuly 7, 2026AZ14-223 Noah2026-AWP-13165-OE · Crane · 219 ft AGL · Salome, AZJuly 7, 2026NM16-263 Bingo2026-ASW-10511-OE · Antenna tower · 75 ft AGL · Artesia, NMJune 26, 2026NM16-263 Bingo2026-ASW-10512-OE · Crane · 85 ft AGL · Artesia, NMJune 26, 2026NV01-266 - NV01-266 TBD2026-AWP-12559-OE · Antenna tower · 60 ft AGL · Henderson, NVJune 24, 2026NV01-266 - NV01-266 TBD2026-AWP-12560-OE · Crane · 80 ft AGL · Henderson, NVJune 24, 2026NM04-251 Lava2026-ASW-9871-OE · Antenna tower · 199 ft AGL · Carrizozo, NMJune 17, 2026NM04-251 Lava2026-ASW-9872-OE · Crane · 209 ft AGL · Carrizozo, NMJune 17, 2026AZ01-2572026-AWP-12041-OE · Antenna tower · 90 ft AGL · Mesa, AZJune 17, 2026AZ15-241 Sammy2026-AWP-5353-OE · Antenna tower · 100 ft AGL · Wellton, AZMarch 27, 2026AZ15-241 Sammy2026-AWP-5355-OE · Crane · 120 ft AGL · Wellton, AZMarch 27, 2026AZ11-232 Toad2026-AWP-5233-OE · Antenna tower · 100 ft AGL · Taylor, AZMarch 23, 2026AZ11-232 Toad2026-AWP-5234-OE · Crane · 120 ft AGL · Taylor, AZMarch 23, 2026AZ02-167 Ghost2026-AWP-4750-OE · Antenna tower · 70 ft AGL · Tucson, AZMarch 16, 2026AZ02-167 Ghost2026-AWP-4755-OE · Crane · 90 ft AGL · Tucson, AZMarch 16, 2026AZ01-177 COBRA2026-AWP-4309-OE · Antenna tower · 40 ft AGL · Peoria, AZMarch 4, 2026AZ01-177 COBRA2026-AWP-4312-OE · Crane · 60 ft AGL · Peoria, AZMarch 4, 2026AZ01-231 Heater2026-AWP-3820-OE · Antenna tower · 85 ft AGL · El Mirage, AZFebruary 27, 2026AZ01-231 Heater2026-AWP-3821-OE · Crane · 105 ft AGL · El Mirage, AZFebruary 27, 2026AZ11-147 Pioneer2026-AWP-3297-OE · Antenna tower · 85 ft AGL · Show Low, AZFebruary 20, 2026AZ11-147 Pioneer2026-AWP-3298-OE · Crane · 95 ft AGL · Show Low, AZFebruary 20, 2026AZ01-218 Tiger2026-AWP-2921-OE · Antenna tower · 70 ft AGL · Buckeye, AZFebruary 9, 2026AZ01-218 Tiger2026-AWP-2923-OE · Crane · 80 ft AGL · Buckeye, AZFebruary 9, 2026AZ02-211 Relish2026-AWP-2187-OE · Antenna tower · 70 ft AGL · Tucson, AZJanuary 28, 2026AZ02-211 Relish2026-AWP-2192-OE · Crane · 90 ft AGL · Tucson, AZJanuary 28, 2026AZ02-150 Cledus2026-AWP-2047-OE · Antenna tower · 80 ft AGL · Tucson, AZJanuary 23, 2026AZ02-150 Cledus2026-AWP-2048-OE · Crane · 100 ft AGL · Tucson, AZJanuary 23, 2026AZ10-233 Horseshoe2026-AWP-1986-OE · Antenna tower · 104 ft AGL · Flagstaff, AZJanuary 22, 2026AZ10-233 Horseshoe2026-AWP-1988-OE · Crane · 124 ft AGL · Flagstaff, AZJanuary 22, 2026AZ03-189 Waylon2026-AWP-1992-OE · Antenna tower · 65 ft AGL · Coolidge, AZJanuary 22, 2026AZ03-189 Waylon2026-AWP-1994-OE · Crane · 85 ft AGL · Coolidge, AZJanuary 22, 2026AZ12-226 Alpine2026-AWP-1843-OE · Antenna tower · 185 ft AGL · Alpine, AZJanuary 21, 2026AZ01-235 High Life2026-AWP-837-OE · Antenna tower · 70 ft AGL · Buckeye, AZJanuary 15, 2026AZ01-235 High Life2026-AWP-838-OE · Crane · 90 ft AGL · Buckeye, AZJanuary 15, 2026NM10-117 Happy Camper2026-ASW-885-OE · Antenna tower · 80 ft AGL · San Mateo, NMJanuary 12, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch Sun State Towers

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.