Organisation · 2026 filings
T-Mobile South — FAA obstruction filings
T-Mobile South filed 118 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.
Filings in 2026
118
Tallest proposed
376 ft
above ground level
Most recent filing
September 1, 2026
What is being filed
- Crane115
- Building2
- Antenna tower1
Where
- FL58
- GA52
- SC8
Most recent 50 filings
Newest first, of 118 total.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Planning something here?
Screen it against Part 77 before you file
LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.