Construction equipment · 2026

Stockpile-Staging-Construction Work Area

Philadelphia, PA · near Philadelphia Intl (0.9 mi)

Returned to proponentDetermined - No Hazard30 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"The project entails rehabilitation and replacement of sanitary sewers at Philadelphia International Airport. The task includes trenched pipe replacement cured-in-place pipe lining of existing sewers rehabilitation of existing manholes and bypass pumping of sanitary sewer flows. The project will be performed at four main work areas: Work Area 1 Work Area 2 Work Area 4 and Work Area 4. Work Area 4 is comprised of two construction work areas one north of Runway 8-26 and one south of Runway 8-26. The area south of Runway 8-26 will also contain a temporary staging and stockpile area. This 7460 form applies to the southern portion of Work Area 4 that contains the temporary stockpile staging and construction working areas. The points in this submission indicate the outer corners of the combined boundary of the stockpile staging and construction working areas as well as the area between those areas. Points 1 2 3 and 6 represent the northeastern southeastern southwestern and northwestern corners of the construction working area respectively. Point 4 represents the southwestern corner of the temporary stockpile area. Point 5 represents the northwestern corner of the temporary staging area. A separate 7460 form will be submitted for the portion of Work Area 4 that is north of Runway 8-26."

Filing details

Case number (ASN)
2026-AEA-1427-NRA
Structure
Stockpile-Staging-Construction Work Area
Type
Construction / vehicle
Category
Construction equipment
Height above ground
30 ft
Height above sea level
37 ft
Site elevation
7 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
April 20, 2026
Determined
August 25, 2026
Determination expires
February 25, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
City of Philadelphia Department of Aviation
Representative
CITY OF Philadelphia

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by City of Philadelphia Department of Aviation →

Location

Coordinates
39.878683, -75.225006
Degrees / minutes / seconds
39°52'43.3"N 75°13'30.0"W
County
Philadelphia

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Philadelphia Intl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.