Crane - Terminal E Light Pole Construction

Philadelphia, PA · near Philadelphia Intl (0.5 mi)

Returned to proponentDetermined - No Hazard150 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"This project is Phase 2 of the Ramp Lighting Project for Terminals A-East and E at Philadelphia International Airport. This project comprises upgrades to ramp lighting for Terminals A-East and E. Major construction components of the project include: demolition of existing building-mounted roof-mounted and ground-mounted lights; excavation and construction of light foundations; erection of light poles and fixtures; cabling and conduit installation from fixtures to airport substations; and concrete slab construction. This submission applies to the mobile crane that will be used to install light poles adjacent to the gates around Terminal E. The points in this 7460 submission pertain to the boundaries of the operational area for the mobile crane that will be used around Terminal E. Separate cases were submitted for the permanent light poles around Terminal A-East (2026-AEA-830-NRA 2026-AEA-829-NRA) and Terminal E (2026-AEA-824-NRA 2026-AEA-825-NRA 2026-AEA-826-NRA 2026-AEA-827-NRA 2026-AEA-828-NRA). A separate case was submitted for the mobile crane to be used for installation of the light poles around Terminal A-East (2026-AEA-832-NRA). The Construction Safety Plan (CSPP) for the project was submitted under Case# 2026-AEA-578-NRA."

Filing details

Case number (ASN)
2026-AEA-833-NRA
Structure
Crane - Terminal E Light Pole Construction
Type
Crane / mobile
Category
Crane
Height above ground
150 ft
Height above sea level
160 ft
Site elevation
10 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
March 10, 2026
Determined
August 27, 2026
Determination expires
February 27, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
City of Philadelphia Department of Aviation
Representative
CITY OF Philadelphia

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by City of Philadelphia Department of Aviation →

Location

Coordinates
39.878336, -75.235300
Degrees / minutes / seconds
39°52'42.0"N 75°14'07.1"W
County
Philadelphia

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Philadelphia Intl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.