Skip to content
LOS Analyzer

Construction equipment · 2026

5G0 - Replace Beacon - Work Area Limits

Rochester, NY · near Le Roy (0.1 mi)

Returned to proponentDetermined - No Hazard17 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"This 7460 for your review is for the Replace Bacon and Tower Project at LeRoy Airport (5G0). Under this project the existing beacon at LeRoy Airport will be removed. A new LED medium intensity L-801A Class 1 rotating beacon which will be installed on a new concrete foundation and new steel tilt-down pole including all associated electrical components will be installed in the proposed location. The beacon will have dual L-810 obstruction lights installed on the highest point of the structure. This proposed beacon location was submitted through a Pen and Ink Change ASN 2025-AEA-3839-NRA and approved on 10/31/2025. The proposed permanent structure height was submitted under ASN 2026-AEA-467-NRA on 02/05/2026."

Filing details

Case number (ASN)
2026-AEA-468-NRA
Structure
5G0 - Replace Beacon - Work Area Limits
Type
Construction / vehicle
Category
Construction equipment
Height above ground
17 ft
Height above sea level
795 ft
Site elevation
778 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
February 6, 2026
Determined
April 7, 2026
Determination expires
October 7, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
LeRoy Aviation Services, Inc.
Representative
Passero Associates

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
42.980011, -77.934597
Degrees / minutes / seconds
42°58'48.0"N 77°56'04.5"W
County
Genesee

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.