Skip to content
LOS Analyzer

Crane · 2026

Tank 908 Construction Crane

Rochester, NY · near Frederick Douglass/Greater Rochester Intl (1.4 mi)

Preliminary findingsPending130 ft AGL

What this outcome means

An interim result issued while the aeronautical study continues. It is not the final determination.

The proposal, in the filer's words

"United Refining Company plans to build a new Tank #908 in their Rochester NY Terminal. The new tank will service the storage of ultra-low sulfur diesel (ULSD) and will stand 70 feet tall and have a diameter of 80 feet. The tank will have galvanized stairs and a standard railing with a toe board around the perimeter of the top of the tank. The tank shall have a fixed cone roof. The tank shall be constructed with conventional construction/fabrication methods utilizing API-650 and Material Group III or IIIA."

Filing details

Case number (ASN)
2026-AEA-7262-OE
Structure
Tank 908 Construction Crane
Type
Crane
Category
Crane
Height above ground
130 ft
Height above sea level
684 ft
Site elevation
554 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
June 16, 2026
Determined
—
Determination expires
—

Who filed it

Sponsor
United Refining Company
Representative
Scott Buhl

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
43.137681, -77.662019
Degrees / minutes / seconds
43°08'15.7"N 77°39'43.3"W
County
Monroe

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Frederick Douglass/Greater Rochester Intl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.