Skip to content
LOS Analyzer

Tank stack · 2026

Yenne Lane Water Tower

Fairhope, AL · near H L Sonny Callahan (1.4 mi)

Preliminary findingsPending175 ft AGL

What this outcome means

An interim result issued while the aeronautical study continues. It is not the final determination.

The proposal, in the filer's words

"demo existing water tower with current AMSL height of 248 feet and replace with larger water tower in same location with AMSL height of approximately 270 feet"

Filing details

Case number (ASN)
2026-ASO-16123-OE
Structure
Yenne Lane Water Tower
Type
Water_tower
Category
Tank stack
Height above ground
175 ft
Height above sea level
270 ft
Site elevation
95 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
August 11, 2026
Determined
—
Determination expires
—

Who filed it

Sponsor
City of Fairhope
Representative
John Byrd

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
30.461661, -87.901283
Degrees / minutes / seconds
30°27'42.0"N 87°54'04.6"W
County
Baldwin

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.