Skip to content
LOS Analyzer

Power line · 2026

Nashville Electric Service Str. A

Nashville, TN · near Smyrna (5.5 mi)

Marking and lightingFinal85 ft AGL

What this outcome means

The outcome turns on marking and lighting conditions — typically obstruction lighting or paint required as a condition of the determination.

The proposal, in the filer's words

"Submitting Only for Marking and Lighting Change Request: Proposed No Marking or Lighting Necessary (Height < 200'). Reference Advisory Circular 70/7460-1 M Change 1 Chapter 2 Section 2.1."

Filing details

Case number (ASN)
2026-ASO-7800-OE
Structure
Nashville Electric Service Str. A
Type
Transmission_line / t_l_tower
Category
Power line
Height above ground
85 ft
Height above sea level
578 ft
Site elevation
493 ft
Notice of
Existing
Duration
Permanent
Marking & lighting
—

Timeline

Filed
April 13, 2026
Determined
May 19, 2026
Determination expires
—

Who filed it

Sponsor
Logan Anastas, MESA Associates, INC.
Representative
Hannah Scott, MESA Associates, INC.

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
36.077483, -86.572100
Degrees / minutes / seconds
36°04'38.9"N 86°34'19.6"W
County
Davidson

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.