Pole lighting · 2026
B25-0618 AOA Gate 300 301 Construction
DFW Airport, TX · near Dallas-Fort Worth Intl (1.4 mi)
What this outcome means
The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.
The proposal, in the filer's words
"B25-0618 AOA Gate 300 301 Construction \nScope requires new conduit cabling dual height card readers pedestals with Biometric readers and intercoms. Proposed concrete pad and new ISC / IT cabinet A/C\nunit ISC panel fiber and copper connectivity UPS and cable management. Network switch to be provided by Owner.\nAOA fencing will be temporally relocated to allow for construction on both sides of the gate. Temporary fencing will remain throughout duration of construction. Gate\nwill be closed during construction. With the SIDA line temporally relocated all work will be performed on public side.\nInfrastructure scope requires concrete saw cutting and demolition on both sides of gate. Trenching for conduit drilling of camera pole pier foundation and bollards \nrough-in conduit inspections performed backfill trenches and take densities. Form and pour drive pole pier foundation and bollards. Camera pole placed on pier\nfoundation.\nConduit placed under concrete shall be Sch 80. Conduit placed under grass shall be Sch 40 with flow-fill concrete duct bank.\n(1) 1” Conduit serving new Biometric card readers\n(1) 1” Conduit serving new camera on pole\n(1) 1” Conduit serving new dual pedestal card readers / Intercom\n(1) 1” Conduit serving ISC – 120V 20A 1P.\nInfrastructure scope requires the following:\nConstruction of (1) Concrete pier foundation 4500 PSI Strength\nConstruction of (1) Concrete equipment pad 4000 PSI Strength\nSetting of a camera pole. Max height of pole and all components equal 22.7 feet.\nHoffman 14 gauge type 316L cabinet on pole\nTAB to install Hanwha PNM-C16083RVQ camera\nDFW to perform FT4 Testing"
Filing details
- Case number (ASN)
- 2026-ASW-790-NRA
- Structure
- B25-0618 AOA Gate 300 301 Construction
- Type
- Pole
- Category
- Pole lighting
- Height above ground
- 25 ft
- Height above sea level
- 621 ft
- Site elevation
- 596 ft
- Notice of
- New Construction
- Duration
- Permanent
- Marking & lighting
- —
Timeline
- Filed
- February 11, 2026
- Determined
- April 8, 2026
- Determination expires
- October 8, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- DFW International Airport
- Representative
- DFW International Airport
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 32.896111, -97.061697
- Degrees / minutes / seconds
- 32°53'46.0"N 97°03'42.1"W
- County
- Tarrant
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Dallas-Fort Worth Intl →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.