Construction equipment · 2026
HWY 11 Bridge Work Area
Tulsa, OK · near Tulsa Intl (1.2 mi)
What this outcome means
An interim result issued while the aeronautical study continues. It is not the final determination.
The proposal, in the filer's words
"Construction of new light poles. Equipment will be limited to the study area only. Maximum boom height not to exceed 98 feet agl. Coordination will be made with the ATCT and TAIT Operations department 3 days prior to and before and after work. The equipment will be flagged/lighted and removed during the IFR nighttime inclement weather and when not in use."
Filing details
- Case number (ASN)
- 2026-ASW-8364-OE
- Structure
- HWY 11 Bridge Work Area
- Type
- Construction / vehicle
- Category
- Construction equipment
- Height above ground
- 98 ft
- Height above sea level
- 754 ft
- Site elevation
- 656 ft
- Notice of
- New Construction
- Duration
- Temporary
- Marking & lighting
- —
Timeline
- Filed
- May 27, 2026
- Determined
- —
- Determination expires
- —
Who filed it
- Sponsor
- Tulsa Airports Improvement Trust
- Representative
- Tulsa Airports Improvement Trust
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 36.180568, -95.887124
- Degrees / minutes / seconds
- 36°10'50.0"N 95°53'13.6"W
- County
- Tulsa
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Tulsa Intl →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.