Skip to content
LOS Analyzer

Crane · 2026

Crane - 2816 Montair Ave

Long Beach, CA · near Long Beach (Daugherty Fld) (1.6 mi)

Preliminary findingsPending165 ft AGL

What this outcome means

An interim result issued while the aeronautical study continues. It is not the final determination.

The proposal, in the filer's words

"Crane to assist with underground utilities"

Filing details

Case number (ASN)
2026-AWP-5013-OE
Structure
Crane - 2816 Montair Ave
Type
Crane
Category
Crane
Height above ground
165 ft
Height above sea level
187 ft
Site elevation
22 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
March 18, 2026
Determined
—
Determination expires
—

Who filed it

Sponsor
The Crane Guys
Representative
Leonard Lopez

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by The Crane Guys →

Location

Coordinates
33.807181, -118.126447
Degrees / minutes / seconds
33°48'25.9"N 118°07'35.2"W
County
Los Angeles

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Long Beach (Daugherty Fld) →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.