LOS Analyzer's analysis of FAA OE/AAA filing records: the off-airport Part 77 notices entered January 1 – September 11, 2026, against the same days of 2025. By structure type, state and sponsor, plus where wind-turbine cases stand.

Data as of September 12, 2026Counts are notices, not structures builtMethodologyDownload the data

Government shutdown. On October 1, 2026 the FAA's OE/AAA portal showed a banner reading "Due to the government shutdown the Federal Aviation Administration (FAA) is unable to accept any new notices under 14 CFR Part 77." The figures here end with the archive of September 12, 2026, before the shutdown. When this page is updated, October's counts will reflect the shutdown, not the market.

The latest weeks are still filling in. Notices reach the FAA's public archive weeks after the FAA enters them: 2,299 of the 7,878 notices entered August 1–21, 2026 (29%) first appeared in the archive of September 12, 2026, not the one of August 22, 2026. So 2026's most recent months will rise, while 2025 is complete. Every comparison below is also given for January–June, which the archive has had time to fill in.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Compiled analysis © Idea Engine LLC, licensed CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/) — credit 'LOS Analyzer'. Underlying FAA data is public domain.

Key figures

Notices entered, January 1 – September 11, 2026

117,253

2025, same days: 111,652 (+5.0%). January–June alone: 90,812 vs 79,511 (+14.2%).

Power-line notices, January–June

+59.5%

21,947 vs 13,758. So far this year: 29,243 vs 20,409 (+43.3%).

Antenna-tower notices, January–June

−25.2%

8,629 vs 11,542. So far this year: 10,983 vs 16,369 (−32.9%).

Wind-turbine cases closed, August 2026

0

Cases with a completion date that month, any outcome. August 2025: 256. Cranes: 2,199; antenna towers: 1,202.

1. Notices entered, month by month

117,253 notices were entered January 1 – September 11, 2026, against 111,652 on the same days of 2025 (+5.0%). January to June, which the archive has had months to fill in, is up 14.2%. The latest months run below last year's partly because the archive is still catching up. The last column of the table shows how many of each month's 2026 notices first appeared in the newest archive.

Notices entered per month, 2026

September 2026 runs to September 11 only and is shown in grey. The 2025 figures are in the table below.

05k10k15k20kJanFebMarAprMayJunJulAugSep
View as table
MonthNotices, 2026
Jan15,270
Feb12,801
Mar15,537
Apr17,988
May14,119
Jun15,097
Jul12,296
Aug11,357
Sep2,788

LOS Analyzer analysis of FAA OE/AAA filing records, data as of September 12, 2026. Download CSV

Notices entered per month, 2025 and 2026, January 1 – September 11
Month202520262026, first in the newest archive
Jan13,90815,27027
Feb12,48912,80164
Mar14,24715,53724
Apr16,72617,98843
May9,60814,11967
Jun12,53315,097140
Jul14,06412,296687
Aug12,92811,3575,778
Sep (1–11)5,1492,7882,788

2. By structure type

Each structure type is compared both ways: over the "so far" window, and over January–June, which the archive has had time to fill in. Where the two disagree, the January–June figure is the steadier read.

Notices by structure type, January 1 – September 11, 2025 and 2026, with the January–June change
Structure type20252026ChangeJan–Jun change
Power line20,40929,243+43.3%+59.5%
Construction equipment16,52719,143+15.8%+22.8%
Crane18,10817,524−3.2%+2.5%
Wind turbine14,27112,118−15.1%−5.4%
Antenna tower16,36910,983−32.9%−25.2%
Pole lighting5,9548,226+38.2%+67.7%
Building7,6815,814−24.3%−31.0%
Rig3,8114,981+30.7%+44.1%
Other1,9653,676+87.1%+202.0%
Fence8061,393+72.8%+62.3%
Tank stack821943+14.9%+7.2%
Road rail1,106806−27.1%−0.5%
Solar2,135642−69.9%−73.1%
Airport development189621+228.6%+701.6%
Sign588569−3.2%+17.1%
Terrain vegetation361251−30.5%−26.1%
Met tower390230−41.0%−38.1%
Bridge10566−37.1%−52.2%
Landfill5624−57.1%−70.4%

LOS Analyzer analysis of FAA OE/AAA filing records, data as of September 12, 2026. January 1 – September 11 of each year. Categories are LOS Analyzer's grouping of the FAA's free-text structure types. Download CSV

Power lines

29,243 power-line notices so far in 2026, against 20,409 on the same days of 2025 (+43.3%); +59.5% for January–June. The states with the most:

LOS Analyzer analysis of FAA OE/AAA filing records, data as of September 12, 2026. Every state and type (CSV)

Antenna towers

10,983 antenna-tower notices so far in 2026, against 16,369 on the same days of 2025 (−32.9%). For January–June it is 8,629 against 11,542 (−25.2%). Grouped by the sponsor name on the record:

Antenna-tower notices by sponsor-name group, approximate
Sponsor groupJan–Jun 2025Jan–Jun 2026So far 2025So far 2026
Crown Castle2,5098323,444948
American Tower1,9621,0542,9241,216
Verizon1,8201,1452,4691,286
SBA7758191,178877
AT&T179154259209
No sponsor name in the record yet——173972

Approximate: a group counts sponsor names that match a simple rule (for example, the name contains "Crown Castle"; the rules are in the CSV), so affiliates filing under other names are not counted. The FAA withholds a sponsor's name while a case is under review, so recent 2026 filings are unnamed until they are determined and these 2026 counts will rise. Organisations only. LOS Analyzer analysis of FAA OE/AAA filing records, data as of September 12, 2026. Download CSV

Cranes

17,524 crane notices so far in 2026, against 18,108 on the same days of 2025 (−3.2%); +2.5% for January–June. Chicago O'Hare Intl is the nearest airport named on more crane notices than any other: 855 so far this year, 763 of them in Elk Grove Village.

Crane notices by nearest airport, 2026

Crane notices by the nearest airport named on the notice, January 1 – September 11, 2026 and 2025
Airport20262025
Chicago O'Hare Intl IL855551
Miami Intl FL301373
Washington Dulles Intl VA231424
Tampa Intl FL176131
Peter O Knight FL17458
Wautoma Muni WI1710
Gilbert Fld WI1580
Ontario Intl CA14634
Long Beach (Daugherty Fld) CA12176
Nogales Intl AZ1180

Top 25 (CSV)

Tallest crane notices of 2026

The ten tallest organisation-sponsored crane notices entered January 1 – September 11, 2026
NoticeHeight
WTC 2 Tower Cranes2026-AEA-5908-OE · New York, NY · Turner Construction Company1,414 ft
343 Madison TC#2 (26039.NYCC.TC2)2026-AEA-4090-OE · Manhattan, NY · NYC Constructors, LLC1,051 ft
343 Madison TC#3 (26039.NYCC.TC3)2026-AEA-4091-OE · Manhattan, NY · NYC Constructors, LLC1,009 ft
Favco 440D2026-AEA-9131-OE · New York, NY · Park Avenue Concrete1,008 ft
TC12026-ASO-7733-OE · Sunny Isles Beach, FL · La Playa Beach Associates LLC960 ft
Tower Crane 22026-ASO-13956-OE · Nashville, TN · 1010 Church Owner, LLC950 ft
Tower Crane 12026-ASO-13957-OE · Nashville, TN · 1010 Church Owner, LLC950 ft
Wolff Crane 355B2026-AEA-898-OE · Brooklyn, NY · RC Structures, Inc.925 ft
TC22026-ASO-7734-OE · Sunny Isles Beach, FL · La Playa Beach Associates LLC887 ft
Demo Crane2026-AGL-4842-OE · Glendale Heights, IL · Prologis800 ft

Height above ground as filed. Organisation-sponsored notices only.

9,875 crane no-hazard determinations have an expiration date between September 12, 2026 and March 11, 2027.

LOS Analyzer analysis of FAA OE/AAA filing records, data as of September 12, 2026.

Wind turbines

New wind-turbine notices: 12,118 so far in 2026, against 14,271 (−15.1%); −5.4% for January–June. No wind-turbine case has a completion date in August 2026, against 256 in August 2025. Crane and antenna-tower cases with a completion date that month: 2,199 and 1,202.

34,817 wind-turbine cases filed since January 1, 2024 are still listed as under review. Of the turbines filed January–June 2026, 84.0% had no completion date by September 11, 2026; the table below gives the same measure for earlier years.

FAA records do not say why a case is open or closed. Each notice is one turbine position, and some open filings may be layouts that were later superseded.

Wind-turbine cases closed per month, January 2025 – September 2026

Cases with a completion date in each month, any outcome. August 2026 is highlighted; September 2026 runs to September 11 only and is in grey.

01k2k3k2560Jan 25Apr 25Jul 25Oct 25Jan 26Apr 26Jul 26
View as table
MonthWind-turbine cases closed
Jan 251,286
Feb 25412
Mar 25771
Apr 252,135
May 251,575
Jun 25675
Jul 25352
Aug 25256
Sep 251,046
Oct 25276
Nov 25728
Dec 251,664
Jan 26859
Feb 261,429
Mar 261,970
Apr 261,112
May 261,883
Jun 26916
Jul 26162
Aug 260
Sep 26105

LOS Analyzer analysis of FAA OE/AAA filing records, data as of September 12, 2026. Download CSV

January–June turbine filings still open

Wind-turbine notices filed January to June each year, and the share with no completion date by September 11 of that year
Filed Jan–JunFiledOpen on September 11
20236,67382.3%
20246,36873.5%
20259,55269.9%
20269,03684.0%

Download CSV

Turbine cases under review, by state

Wind-turbine cases filed January 1, 2024 to September 11, 2026 still listed as under review, by state
StateUnder review
TX13,150
IL3,257
NM2,075
KS1,928
WY1,844
MI1,788
CO1,530
WA1,206

Filed January 1, 2024 – September 11, 2026; 34,817 in all. All states (CSV)

3. By state

The fifteen states with the most notices so far in 2026. Every state, and every state by structure type, is in the CSVs.

Notices by state, January 1 – September 11, 2025 and 2026, with the January–June change
State20252026ChangeJan–Jun change
TX13,79715,958+15.7%+38.4%
FL10,96310,043−8.4%+0.1%
CA7,0677,996+13.1%+7.6%
IL5,2376,226+18.9%+52.6%
MN3,5413,936+11.2%+1.6%
OH2,4443,778+54.6%+86.6%
AZ2,7413,326+21.3%+31.6%
WI1,7243,325+92.9%+88.4%
VA3,7783,125−17.3%+6.2%
PA2,1723,056+40.7%+47.0%
NV3,2203,039−5.6%+16.8%
MI3,2012,919−8.8%−14.5%
CO2,2812,823+23.8%+38.4%
NY2,4562,702+10.0%+13.9%
AK1,0812,621+142.5%+189.2%

LOS Analyzer analysis of FAA OE/AAA filing records, data as of September 12, 2026. All states (CSV)

Methodology and caveats

Source. The FAA's Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive, as published on September 12, 2026. These are LOS Analyzer's counts of the FAA's filing records, not figures the FAA publishes, and the FAA has not reviewed them. The FAA provides the archive "as is".

What is counted. Off-airport Part 77 notices (14 CFR Part 77, Subpart B), by the date the FAA entered them. A notice is a proposal to build or alter something, not a structure that was built, and one project can file many notices: one per turbine, crane or tower position.

"So far." January 1, 2026 to September 11, 2026, the last full day in the archive, compared with January 1, 2025 to September 11, 2025. Notices reach the public archive weeks after they are entered, so 2026's latest weeks are incomplete and 2025's are not. That makes 2026's "so far" totals a floor; the January–June comparisons are the steadier read.

Government shutdown. The archive behind this page predates the government shutdown: from October 1, 2026 the FAA's OE/AAA portal showed a banner saying the FAA could not accept new Part 77 notices. October counts will reflect that, not demand.

Structure types are LOS Analyzer's grouping of the FAA's free-text structure-type field, so the category boundaries are ours. Nearest airport is the airport named on the notice.

Sponsor groups match the sponsor name on the record against a simple rule, so they are approximate. The FAA withholds a sponsor's name while a case is under review, so recent filings carry no name yet.

Cases closed counts cases by their completion date, whatever the outcome. Under review is the case status in this archive. FAA records do not say why a case is open, and some open filings may be superseded layouts. Expiring determinations counts "No Hazard" determinations by their expiration date; it does not know whether the crane has already been used.

Names. Totals include every notice, because a count names no one. The only organisations named here are sponsor groups and the sponsors of the tallest crane notices, and those come from organisation-sponsored notices only. No table names a representative, and the CSVs hold aggregates only.

Corrections. If a figure here looks wrong to you, email support@idea-engine.studio and we will check the query and publish a correction.

Download the data

Every table behind this page, as CSV, plus a README with the definitions. Aggregate counts only. Free to use and quote under CC BY 4.0 with credit to LOS Analyzer, no signup.

How to cite this

According to LOS Analyzer's analysis of FAA OE/AAA filing records (archive dated September 12, 2026), "FAA filings 2026 so far". https://los-analyzer.idea-engine.studio/reports/faa-filings-2026-so-far

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Compiled analysis © Idea Engine LLC, licensed CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/) — credit 'LOS Analyzer'. Underlying FAA data is public domain.

Why we built this

We read this archive because we screen structures against it

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's line of sight to the runway, terrain-aware, before you file. It is a preliminary screening, not an FAA determination and not a substitute for a licensed engineering review. For the longer view, read The State of FAA Obstruction Filings.