Skip to content
LOS Analyzer

Building · 2026

New Airfield Electrical Vault at PNE

Philadelphia, PA · near Northeast Philadelphia (0.2 mi)

Returned to proponentDetermined - No Hazard13 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"Construction of a pad-mounted permanent airfield electrical vault associated with the Miscellaneous Electrical Work - Phase 2 project at Northeast Philadelphia Airport. The points in this submission represent the corners of the proposed vault footprint. The heights provided for each corner include the height of the concrete pad the vault is mounted on. No rooftop appurtenances antennas lighting or obstructions are proposed. Three permanent wind walls (approximately four feet wide and ten feet high) will be installed within a foot of and perpendicular to the vault walls at the end of each entrance ramp two on the southwest side and one on the northwest side of the vault. (see Exhibit B). Adjacent to the proposed vault on the side closest to Runway 6-24 the following permanent pad-mounted electrical equipment will be installed: an equipment rack a transformer and two loop switch stations. Adjacent to the equipment pad on the side closest to Runway 6-24 a light pole will be installed on a separate foundation. A separate 7460 form will be submitted for the pad-mounted electrical equipment and light pole. There will be two staging/stockpile areas for the construction. Two separate temporary construction 7460 forms will be submitted for each staging/stockpile area. There will be underground construction for miscellaneous electrical work in the areas on and around Taxiway G Taxiway C Runway 15-33 and Taxiway A. Separate 7460 forms will be submitted for the areas of that temporary construction work."

Filing details

Case number (ASN)
2026-AEA-1308-NRA
Structure
New Airfield Electrical Vault at PNE
Type
Building
Category
Building
Height above ground
13 ft
Height above sea level
119 ft
Site elevation
106 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
April 14, 2026
Determined
August 4, 2026
Determination expires
February 4, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
City of Philadelphia Department of Aviation
Representative
CITY OF Philadelphia

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by City of Philadelphia Department of Aviation →

Location

Coordinates
40.083903, -75.007669
Degrees / minutes / seconds
40°05'02.1"N 75°00'27.6"W
County
Philadelphia

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Northeast Philadelphia →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.