Construction equipment · 2026

Construction Staging/Stockpile Area 1

Philadelphia, PA · near Northeast Philadelphia (0.4 mi)

Returned to proponentDetermined - No Hazard20 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"Temporary contractor staging and stockpile area (Staging Area 1) associated with the Miscellaneous Electrical Work - Phase 2 project at Northeast Philadelphia Airport. Use is limited to ground-level material storage and construction equipment parking. No vertical structures cranes towers lighting or guyed equipment are proposed. The points in this submission represent the outermost corners of the staging/stockpile area. The heights provided for the points indicate the maximum height of the temporary stockpile and the temporarily parked equipment that will be within the bounded area. Another temporary construction staging/stockpile area (Staging Area 2) is proposed southwest of Staging Area 1. A separate 7460 form will be submitted for Staging Area 2. A permanent airfield electrical vault is proposed adjacent to the existing airfield electrical vault that will be demolished. A separate 7460 form was submitted for that proposed vault. Ancillary electrical equipment and a light pole will be permanently installed adjacent to the proposed vault on the side closest to Runway 6-24. A separate 7460 form will be submitted for the electrical equipment and light pole. There will also be underground construction of miscellaneous electrical work in the areas on and around Taxiway G Taxiway C Runway 15-33 and Taxiway A. Separate 7460 forms will be submitted for the areas of that temporary construction work."

Filing details

Case number (ASN)
2026-AEA-1312-NRA
Structure
Construction Staging/Stockpile Area 1
Type
Construction / vehicle
Category
Construction equipment
Height above ground
20 ft
Height above sea level
134 ft
Site elevation
114 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
April 14, 2026
Determined
August 4, 2026
Determination expires
February 4, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
City of Philadelphia Department of Aviation
Representative
CITY OF Philadelphia

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by City of Philadelphia Department of Aviation →

Location

Coordinates
40.086086, -75.004169
Degrees / minutes / seconds
40°05'09.9"N 75°00'15.0"W
County
Philadelphia

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Northeast Philadelphia →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.