Skip to content
LOS Analyzer

Crane · 2026

New Hudson Drain Cleanout-4

New Hudson, MI · near Oakland Southwest (0.2 mi)

Returned to proponentDetermined - No Hazard40 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"New Hudson Drain cleanout removal of existing culvert and replacement with a new box culvert in same general area. Location D-7 work will be utilizing a 200ft high crane. Other locations along the drain D-1 to D-6 and D-8 to D-12 will be utilizing an excavator mobile machine with a maximum boom height of 40ft above ground to do the proposed cleanout work. Due to the necessary impact to the airport taxiway the airport will be closed for entire duration of this project."

Filing details

Case number (ASN)
2026-AGL-7395-NRA
Structure
New Hudson Drain Cleanout-4
Type
Crane
Category
Crane
Height above ground
40 ft
Height above sea level
959 ft
Site elevation
919 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
April 24, 2026
Determined
July 31, 2026
Determination expires
January 31, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
South HILL Business PARK WEST, LLC
Representative
Atwell, LLC

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by South HILL Business PARK WEST, LLC →

Location

Coordinates
42.502358, -83.628186
Degrees / minutes / seconds
42°30'08.5"N 83°37'41.5"W
County
Oakland

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Oakland Southwest →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.